Tube transit: I think it costs 10kW each time you use it so it's best done for long range upward/sideways travel.

I ran into the problem of being told there was "No landing available" at several junctures. Turns out, I needed to run the mouse over sections I'd built to smooth them over. It didn't cost anything, it just connected several adjacent sections into a whole.

I think the main issue you'll have is making enough plastic and making sure neither the newly-made plastic nor the machine that produces it overheats.